Mary Harris
3332 North 57th Ave
Phoenix, AZ 85031
US
Valleywide Pro Roofing 4022 W Palo Verde Dr
Phoenix, AZ 85019
US
Date
September 26, 2023
Estimate Number
476
Estimate Due
October 26, 2023
Estimate Total
$288.60
  1. Service
    Price
    %
    Amount

    ESTIMATE SPECS

    • —This estimate applies to the entire patio @ {roof_squares} sq’s.
    • —Remove ____rolled roofing; ____ built up roofing;  ____ shingles; ____, foam from the patio.
    • —Remove felt and remove and replace battens from the entire {roof_type}.
    • —Remove and replace ______ ft of ______ fascia board, and ______ft of ______ trim from patio.
    • —Remove and replace {plywood} sheets of bad plywood (as needed) throughout the patio.
      Additional plywood sheets (if needed) would add $80 per sheet to the total.
    • —Apply new SA-SBS Rolled Roofing Peel Stick Basesheet and Capsheet over the entire patio.
    • —Install {drip_edge} pieces of 2inch x 2inch drip edge around the perimeter of the entire patio.
    • —Tie the patio roof into the ____shingle roof, ____tile roof, ____wall flashing as needed.
    • —Install {l_metals} new L flashings, {roof_jacks} roof jack flashings and {t-top_vents} T-Top air vents throughout the patio.
    • —Seal all penetrations, haul away debris and keep yard clean.
    • —Provide {warranty} warranty against leaks over the entire patio, @ {roof_squares} sq’s.
    • ESTIMATED COMPLETION: {completion_days} Days
    • WE PROPOSE hereby to furnish material and labor – complete in accordance with the above specifications, for the sum listed. Tax is included in price.
    $390
    26%
    $288.60
Subtotal $288.60
Total $288.60

These payment options will include a service fee:
or 2.9% with a Stripe Checkout Payment.

Notes

Thank you; we really appreciate your business! Please be sure to leave us a review upon completion of your project – we reward any reviews with a special gift! Referrals are our lifeline, please tell your neighbors about Valleywide!

Terms

To approve this estimate, 50% is due prior to the beginning of the project. 50% due upon completion.

Viewed
September 26, 2023 @ 9:38 pm

Estimate viewed by Carlos Mendivil (carlos) for the first time.

Viewed
September 29, 2023 @ 2:46 pm

Estimate viewed by (valleywide) for the first time.

Viewed
September 30, 2023 @ 8:35 am

Estimate viewed by 172.69.34.17 for the first time.

Viewed
January 13, 2024 @ 6:32 pm

Estimate viewed by for the first time.

Viewed
March 24, 2024 @ 6:21 am

Estimate viewed by 162.158.134.158 for the first time.

Viewed
April 12, 2024 @ 9:06 am

Estimate viewed by 172.69.33.8 for the first time.

Viewed
April 12, 2024 @ 9:07 am

Estimate viewed by 172.70.207.128 for the first time.

Status Update
April 12, 2024 @ 9:07 am

Status changed: Pending to Declined.

Viewed
July 11, 2024 @ 2:02 pm

Estimate viewed by 172.70.55.49 for the first time.